Projects

With extensive experience in managing large and complex capital projects, Envirotech Water Solutions possesses the expertise and capability to deliver, operate, and maintain water infrastructure. From municipal treatment plant upgrades to project management and client support, we ensure successful outcomes.

GRAMPIANS WIMMERA MALLEE WATER

Mallee Towns Pipeline Project

The Mallee Towns Pipeline project consists of a 132km pipeline connected to the Wimmera Mallee pipeline, supplying the townships of Beulah, Brim, Sea Lake and Woomelang with reticulated drinking water supply.

Envirotech Water was contracted by principal Mitchell Water to design, construct and commission the water supply infrastructure for the project, including:

GRAMPIANS WIMMERA MALLEE WATER

South West Loddon Pipeline Project

The South West Loddon water supply project was completed in February 2020 and consists of over 1,300km of pressurised stock and domestic pipelines connecting the west waranga channel with the Wimmera Mallee pipeline. The pipeline connects over 600 properties over 2900 square kilometres and provides a secure water supply for the climate-stressed region of south west Loddon in North West Victoria.

Envirotech Water was contracted by principal Mitchell Water to design, construct and commission the water supply infrastructure for the project, including:

GRAMPIANS WIMMERA MALLEE WATER

Harrow Urban Water Supply Upgrade

Envirotech Water was engaged by Goulburn Wimmera Mallee Water to construct new water storage to replace the old earthen reservoir and pump station in Harrow to increase reticulation water pressures and improve water quality for the township.

Envirotech was awarded principal contractor for the detailed design, supply, construction and commissioning of all mechanical, civil, and electrical works and infrastructure for the project, including:

We recognise the value of continuity of people. Our in-house knowledge is recognised as providing ‘turn key’ solutions quickly and effectively.