The Keilor Park Recreational Reserve Alternative Water Supply Scheme involves the diversion and treatment of stormwater from Melbourne Water’s Translink Business Park main drain, VicRoad’s Keilor Park Drive main drain and Brimbank’s onsite drainage system located at Keilor Park Recreational Reserve. The captured water will be undergo treatment via a gross pollutant trap, sedimentation underground tanks and a UV disinfection system and connect into the site’s existing irrigation system.
Keilor Park Alternative Water Supply Project
Keilor Park Alternative Water Supply Project
Overview
Project Scope
Envirotech were commissioned to supply & install two pump stations complete with groundwater & submersible pumpsets, discharge pipework, chemical dosing equipment, pipework & valves.
Supply & Installation of two pump stations complete with:
- 2x 22kW groundwater pumps & 1x 5kW submersible pump
- 316SS suction / discharge pipework & DICL pipeline connections
- isolation, NRV & control valves
- chemical dosing & chlorine gas equipment & pipework